Vecna Robotics RFQ Data Sheet for warehouse automation evaluations

A useful warehouse automation RFQ states what the robot carries, how often each route is demanded, where constraints occur, which control layer owns each decision and how performance will be accepted. This page reuses a compact compliance-style structure to capture those engineering facts—not sustainability slogans.

Requirements ledger

Capture facts, assumptions and open questions separately

Use one row per operating case when loads or routes differ materially. Attach source files, timestamps and owners so changes can be traced during design review with Vecna Robotics.

Input groupMinimum informationWhy it changes the conceptPreferred evidence
Load unitLength, width, height, mass, underside, center of gravity, overhang, orientation and stabilityControls carrier interface, payload margin, pickup tolerance, braking and safe transferDimensioned drawing, weight range, representative samples
Material flowOrigins, destinations, moves by interval, SKU/order profile, replenishment, peak duration and cutoffDetermines mission demand, travel, queueing, buffer occupancy and robot quantityTimestamped transaction extract and route matrix
Site geometryClear aisle width, turns, gradients, floor joints, doors, lifts, crossings, safety zones and charging areasDefines feasible paths, speed restrictions, traffic rules and intervention accessCurrent CAD, measured survey, marked photographs
Control interfacesWMS/WCS/WES/PLC/FMS ownership, messages, acknowledgements, timeouts, alarms and network policyPrevents duplicated decisions, silent failures and unresolved exception statesResponsibility matrix, interface specification, sequence diagrams
AcceptanceDesign and peak rates, transaction definition, availability boundary, test duration, fault cases and evidence ownerTurns commercial expectations into repeatable FAT and SAT decisionsApproved protocol, scenario data, result and deviation template

Key specification fields Vecna Robotics expects in the pack

  • System throughput — design and peak order lines per hour or moves per hour with SKU/order profile attached.
  • Rated load — kg with center of gravity and mm dimensions for every adapter family.
  • Aisle / clear width — mm at the tightest turn, door and pedestrian crossing.
  • Interface cycle time — seconds for WMS/WCS/PLC handshake and exception timeout.
  • System availability — percent target stated at subsystem and end-to-end levels, with mean time to repair assumptions.

Do not compress uncertainty into one fleet number

Where input is unknown, record a range and name the validation action. A 30-minute peak has a different effect from a full-shift peak. A nominal tote size does not represent damaged, overfilled or mixed containers. A map without pedestrian activity and temporary staging does not represent the live route. Making uncertainty explicit protects both selection and later acceptance for Vecna Robotics projects.

Peak throughput versus operational resilience is a real dispute in warehouse automation. If the business prioritizes a holiday spike, document the allowed degradation after the spike and the buffers that absorb it. If the business prioritizes stable recovery, document mean time to repair, spare location and fallback manual paths before celebrating a headline rate.

Submission check

Before issuing the RFQ to Vecna Robotics

01

Transaction is defined

The rate states exactly what completes a move or order line, including pickup and drop confirmation.

02

Peak has a window

Demand identifies duration, recurrence, replenishment overlap and whether backlog is allowed.

03

Buffers are located

Every station and lane has a capacity, blocking rule and response when full or unavailable.

04

Interfaces have owners

Commands, data state, retries, alarms and manual decisions belong to named systems and teams.

05

Safety paths are visible

Pedestrian crossings, restricted areas, maintenance access and intervention points appear on the layout.

06

Failures are test cases

Blocked routes, host silence, network loss, low battery, lost load and disabled stations have expected outcomes.

Reference and certification boundaries

If the project cites ISO 12100:2010, ISO 3691-4:2020, ISO 13849-1:2015 or a regional machinery regulation, specify whether each item is a design reference, product requirement, site integration obligation or requested third-party certificate. Do not use a framework name as a substitute for model-specific documentation. Vecna Robotics will not treat a logo row as acceptance evidence.

For brownfield deployments, include cutover zones, allowed downtime, rollback steps, inventory reconciliation and temporary manual flow. For expansion, include the next expected destinations, workload range, charging capacity and network growth so the initial phase does not create avoidable constraints.

Reproducible acceptance example

Freeze the route map, fleet configuration, interface version and test dataset before a run. Execute a named transaction mix for a stated duration, record completed and failed moves, queue time, buffer occupancy, battery state and recovery time, then repeat the same scenario after each material change. An example protocol requires a 120-minute nominal run followed by blocked-path, host-timeout and unavailable-station scenarios; the numbers are test conditions to approve, not Vecna Robotics performance claims.